Skip to content
Etching & depositionMVP

Deposition process time

Estimate the time to reach a target thickness at a given deposition rate.

Inputs

Constant-rate assumption

This assumes a constant deposition rate for the whole run. Real rates vary (especially during nucleation), so treat the result as a planning estimate.

Result

Enter values and calculate to see the result.

Interpretation

Enter a target thickness and a deposition rate.

Formula

Process time
time = thickness / rate

Constant-rate estimate.

Variables

SymbolVariableUnit
timeProcess times (shown as min)
thicknessTarget thicknessm
rateDeposition ratem/s

Assumptions & validity

Worked example

thickness = 100 nm, rate = 50 nm/min.

time = 100 nm / 50 nm/min = 2 min

Related concepts

Related lessons

Related tools

From this tool

Connected to the ecosystem

Related concept

Related manufacturing

Related equipment

  • CVD reactors
  • PVD sputtering tools
  • ALD reactors
Equipment stage →

Related materials

  • Precursor gases
  • Sputter targets (e.g. Ti, Ta, Cu)
  • Dielectric sources
Materials stage →

Supply-chain stage

Related companies

Related tools