Deposition process time

Estimate the time to reach a target thickness at a given deposition rate.

Inputs

Constant-rate assumption

This assumes a constant deposition rate for the whole run. Real rates vary (especially during nucleation), so treat the result as a planning estimate.

Result

Enter values and calculate to see the result.

Interpretation

Enter a target thickness and a deposition rate.

Formula

Process time
time = thickness / rate

Constant-rate estimate.

Variables

SymbolVariableUnit
timeProcess times (shown as min)
thicknessTarget thicknessm
rateDeposition ratem/s

Assumptions & validity

Worked example

thickness = 100 nm, rate = 50 nm/min.

time = 100 nm / 50 nm/min = 2 min