Etch time estimator

Estimate the time to etch a given thickness at a known etch rate.

Inputs

A planning estimate only

Real etch processes use endpoint detection and build in process margin rather than running for a fixed calculated time — over-etching into the layer below is a real risk.

Result

Enter values and calculate to see the result.

Interpretation

Enter the material thickness and the etch rate.

Formula

Etch time
time = thickness / rate

Constant-rate estimate; real etches use endpoint detection.

Variables

SymbolVariableUnit
timeEtch times
thicknessMaterial thicknessm
rateEtch ratem/s

Assumptions & validity

Worked example

thickness = 150 nm, rate = 300 nm/min.

time = 150 nm / 300 nm/min = 0.5 min = 30 s