India update1 min read
India's semiconductor push: the projects taking shape
The publicly announced fabs and assembly plants putting India on the map.
By Semitree
#India#fabs#ATMP
India has moved from almost no domestic chip manufacturing toward a set of publicly announced fabs and assembly-and-test facilities. This is an overview of those projects; for anything time-sensitive, always check primary sources.
Where the projects are
- Gujarat has attracted the most activity — an assembly-and-test facility at Sanand and a fab project at Dholera, among others.
- Assembly-and-test (OSAT/ATMP) projects span several states, reflecting where packaging can scale first.
- Design centers of global companies have operated in Bengaluru, Hyderabad, and Noida for years.
Semitree lists only publicly announced facilities, at city level, and never fabricates specifics. Explore the companies for details.
The analysis
- What happened?
- India has gone from almost no domestic chip manufacturing to a set of publicly announced fabs and assembly-and-test plants — a wafer fab at Dholera and several ATMP/OSAT facilities, most clustered in Gujarat, plus a first plant in Assam.
- Why does it matter?
- It gives the country its first end-to-end manufacturing footprint and a foothold in a supply chain that has been concentrated in a handful of regions. The design talent was already here; manufacturing is the new piece.
- What technology is involved?
- The announced plants span front-end fabrication and back-end assembly, test, and packaging — including the advanced-packaging capability that is now central to performance.
- Where it fits in the value chain
- These projects populate the Fabrication and Packaging & Test stages of the chain; design and EDA have been present in India for years.
- Who is involved?
- Tata Electronics (with PSMC), Micron, CG Power (with Renesas), and Kaynes are among the companies with approved facilities; global design centres from Intel, NVIDIA, Qualcomm, AMD, Arm, and others operate in Bengaluru, Hyderabad, and Noida.
- What suppliers are required?
- A fab and ATMP ecosystem needs equipment, chemicals, gases, wafers, substrates, and cleanroom suppliers — much of which India still imports.
- What India can do today
- Chip design and engineering talent is India's strongest asset, and assembly/test is scaling first because it is less capital- and technology-intensive than leading-edge fabrication.
- What remains missing?
- A deep local supplier base, materials and gases at scale, leading-edge process capability, and a larger specialised manufacturing workforce are still being built.
- What could change?
- As the first plants reach production and ecosystem suppliers localise, India could move from assembly toward more of the chain — but timelines and ramps depend on execution.
- What to watch next
- Construction and production milestones at Dholera and the Sanand/Jagiroad plants, new supplier announcements, and state-level incentives and talent programmes.
Related
Companies
Technologies
Supply-chain stage
India states
Related insights
Keep exploring
Read next
Get Semitree in your inbox
Semiconductor insights, research, and industry updates.